Rad-data-comm ASM-60 Manuale Utente Pagina 35

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 74
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 34
ASM-60 Installation and Operation Manual Chapter 5 Diagnostics
Running the Diagnostic Tests 5-5
5.3 Running the Diagnostic Tests
Running the LEDs Test
The ASM-60 modem can perform the front-panel indicators test to verify that the
unit LEDs are functioning properly.
To run the LEDs test:
1. From the Main menu, type 3.
The Test menu appears.
2. From the Test menu, type 2 to run the LEDs test on ASM-60.
All the front-panel LED indicators light up for 3 seconds.
Main Menu
3
Test
2
Start LEDs Test
Vedere la pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 73 74

Commenti su questo manuale

Nessun commento